Macau Incineration Center Administration Building

Macau Incineration Center Administration Building
Project Introduction

Product structure: 8TP coating + 1.52PVB + 3.2CdTe + 1.52PVB + 8TP


Light transmittance: 20%


Project location: Macau


The third phase expansion project of the Macau Waste Incineration Center is affiliated to the Environmental Protection Bureau. It has a component-type BIPV curtain wall structure. 1,500 square meters of cadmium telluride photovoltaic modules are installed on the four facades of the east, south, west and north, which can effectively absorb the external light radiation of the building, reduce the temperature level inside the building, and achieve energy saving and consumption reduction by green means. It has achieved a win-win situation of beauty and power generation, and fully demonstrated the advantages of green buildings.